To enable our customers to plan their journey to SAP S/4HANA in detail, we have created the “Simplification List for SAP S/4HANA, on-premise edition 1511.” This list provides detailed functional-level descriptions of the required changes to individual transactions and solution capabilities in SAP S/4HANA. It supports customers who are transitioning from SAP ERP 6.x or SAP Simple Finance, on-premise edition, to SAP S/4HANA, on-premise 1511 edition and includes guidance on the activities customers need to complete before, during, and after the conversion to SAP S/4HANA.

In addition to the Simplification List the Maintenance Planner, the conversion Pre-Checks and the Custom Code Migration Worklist are offered to give a tool-based support for the customer.

 

SCN Blog.JPG

 

For more details regarding these tools see the following S/4HANA SCN Blog: http://scn.sap.com/docs/DOC-68976

Based on the experience gained from current projects, we expect that a typical customer system will be affected by on average 30 to 40 of the currently around 300 Simplification Items. Technical pre-checks, which assess the usage and configuration of a customer’s existing SAP Business Suite system, identify the relevant Simplification Items. Customers can run these pre-checks on their existing SAP Business Suite systems during the planning phase prior to the actual conversion to SAP S/4HANA. SAP plans to further improve the process of identifying Simplification Items by providing additional pre-checks and even more advanced tools that will reduce the list per system to a specific subset for that particular system.

The Simplification List, therefore, serves three purposes:

  • Planning the actual system conversion from a traditional ERP solution to SAP S/4HANA
  • Reducing efforts during the actual conversion by enabling individual Simplification Items to be dealt with in advance for those customers intending to migrate in a future project (if, for example, they are currently tied up in other projects)
  • Implementing SAP S/4HANA-compliant strategic capabilities when rolling out new capabilities to avoid rework on SAP S/4HANA (relevant to, for example, customers who still need to finish major rollouts prior to converting to SAP S/4HANA)

 

With this S/4SCN Blog we want to start a series of blogs providing more information about dedicated simplification items. Simplification items where we assume that any customer project has to deal with. We are planning to provide for a list if dedicated simplification items per item a dedicated S/4HANA SCN blog with dedicated information. Based on the single S/4HANA SCN blogs feedback can be given and questions can be raised (which we try to answer as fast as possible). See below an initial list of items where we plan to offer such additional S/4HANA SCN blogs with additional information.

 

We start this approach with the first item – the Business Partner Approach (Customer-Vendor Integration).

 

 

SAP S/4HANA, on-premise edition – General Information

Master Data Area

Business Partner Approach / Customer-Vendor Integration (CVI)

Link

Material Field Length Extension

will follow soon

Sales & Distribution

SD Simplified Data Models

will follow soon

Data Model Changes in SD Pricing

will follow soon

Foreign Trade

will follow soon

Credit Management

will follow soon

Procurement

Co-Deployment of SAP SRM

will follow soon

Subsequent Settlement - Vendor Rebate Arrangements

will follow soon

Inventory Management (MM-IM)

Data model in inventory management (MM-IM)

will follow soon

Material Ledger Obligatory for Material Valuation

will follow soon

PLM

Easy Document Management (Easy DMS)

will follow soon

BOM, Routing, Production Version

will follow soon

PP

PP-MRP - Subcontracting

will follow soon

Storage Location MRP

will follow soon

Simplified Sourcing

Link

Financials

Data Model Changes in FIN

will follow soon

Data Structure Changes in Asset Accounting

will follow soon

Cash Management

will follow soon

Technical Changes in Controlling

will follow soon

Cross Topics

Analytics

will follow soon

Output Management

Link

Data Migration Functionality within SAP S/4HANA, on-premise

will follow soon

 

 

…..

 


Condition Contracts

$
0
0

Hi All,

 

I have tried looking for any documentation support on condition contracts but could find only the below one. I could not make much use of it and need some help. Please suggest some steps or documents you have on the process of condition contracts. I understand in S/4 HANA, settlement management with condition contracts have to be used as a replacement for rebate management. I tried setting up the same in the system but am not sure what contract type to be used, etc. I created a contract but do not see the condition type in the billing document. My worry is that I might be missing something without understanding the full picture and hence need help.

 

Condition Contract-Based Settlement - Compensation Management - SAP Library

 

Thanks & Regards,

Vidya

Condition Contracts

$
0
0

Hi All,

 

I understand the SD Rebate Management is not available in S/4 HANA and Condition Contracts in settlement management has to be used. I have searched for documentation on this but have not got any. The only document available is SAP Help but not much information is available in that too in terms of setting up the config and the process. I tried to do the steps myself but after creating a contract and while settling it, the system says that the schema could not be determined. So, there could be many things which I might be missing.

 

So, request you all to provide any documentation you have on this functionality or provide any information which can be helpful for me to set it up completely.

 

Thanks,

Vidya

Error when calling Credit Management

$
0
0

Dear All,

While creating sales order in s/4 hana, Im getting the below error

 

Error when calling Credit Management: Technical Error

Message no. UKM_PI008

 

 

Can you guys please help me get through it?

 

Regards

Akber

The System Conversion to SAP S/4HANA, on-premise edition 1511 - Technical procedure and semantic adaption tasks

$
0
0

Release of SAP S/4HANA, on-premise edition 1511

In November 2015 (1511) updates have been released for both, SAP S/4HANA, on-premise and cloud edition. In November 2015, SAP delivered a massive wave of simplification and innovation in the core of SAP S/4HANA. With this delivery, enterprises can drive unprecedented business value with innovative use-cases - in core financial and operational areas such as in logistics – taking full advantage of a simplified data model and a responsive user experience.

Key simplifications and innovations include:

  • Optimized working capital with new accounts payables and receivables cockpits
  • Decreased stock buffers with simplified data model in inventory management for real-time, high-volume processing
  • Increased visibility with real-time stock and material flow insight
  • Reduced manufacturing cycle time with streamlined material flow for internal requirements (MRP)
  • Augmented reactivity with real-time monitoring of production orders regarding flow and critical issues
  • Improved operational decisions with easy simulation of supply alternatives
  • Lower procurement costs with standard integration to the Ariba Business Network
  • Better customer service with new sales order fulfillment cockpit for instantly identifying bottlenecks and issues

 

For more information see as well the SCN blog from Sven Denecken: Link

 

 

The System Conversion to SAP S/4HANA, on-premise edition 1511

Different transition paths are supported with SAP S/4HANA, on-premise edition 1511:

 

Figure 1.PNG

 

 

  • New Implementation
    New installation of SAP S/4HANA e.g. for customers migrating a legacy system.
  • System Conversion
    Customers who want to change their current system into a SAP S/4HANA system.
  • Landscape Transformation
    Customers who want to consolidate their landscape or to selectively transform data into a SAP S/4HANA system.

 

The SAP S/4HANA, on-premise edition 1511 system conversion supports one-step procedure (Database, SAP NetWeaver and application transition in one step) for SAP ERP 6.0 EHP x…7 systems. System Conversion requires a Unicode (UC) source system. Non-Unicode source systems will require a two-step approach (first move to Unicode then to SAP S/4HANA, on-premise edition 1511).

 

Figure 2a.PNG

 

 

Basically it can be distinguished between technical and semantic tasks during the system conversion. The technical installation procedure is based on established lifecycle management tools (Maintenance Planner, Software Update Manager [SUM] and Database Migration Option [DMO]). Due to the fact that SAP S/4HANA is a new product line (and not the successor of SAP Business Suite) things are done differently in SAP S/4HANA.

  • Many of the changes are technical in nature and have no or only limited impact on peoples work and thus do not trigger business change management. Such changes will be mandatory when converting a system to SAP S/4HANA.
  • Other decisions are more of a strategic nature determining which version of functional support will evolve into the digital era and provide the capabilities demanded from the unstoppable business process innovation. Where those strategic directions demand change management through adoption, SAP at large keeps the traditional capabilities available as compatibility scope enabling a rather technical migration of these processes and leaving the time of change management at customer decision that may well happen when initially converting or at a later point in time.

 

To allow our customers a better planning and estimation of their way to SAP S/4HANA, we have created the “Simplification List for SAP S/4HANA, on-premise edition 1511”. In this list we are describing in detail on a functional level what happens in S/4HANA to individual transactions and solution capabilities. In some cases, we have merged certain functionality with other elements or reflected it within a new solution / architecture compared to the SAP Business Suite products.

 

The technical procedure – well established tooling

Maintenance Planner

The Maintenance Planner checks the system with regards to business functions, industry solutions, and add-ons. If there is no valid path for the conversion (for example, the add-on is not released yet), the Maintenance Planner prevents the conversion.

The Maintenance Planner is a pre-requisite for the system conversion to SAP S/4HANA, on-premise edition 1511. The Maintenance Optimizer (MOPZ) is not used

For more information regarding Maintenance Planner see SAP Help: http://help.sap.com/maintenanceplanner

 

Software Update Manager (SUM)

Software Update Manager (SUM) is the technical tool for system conversion to SAP S/4HANA, on-premise edition 1511.

Note:

  • You must run the Maintenance Planner before the SUM.
  • Ensure that the latest version of the Software Update Manager is used:

For all information about using the SUM, please see the document Conversion of SAP Systems to SAP S/4HANA, on-premise edition Using Software Update Manager available at:

  • service.sap.com/sltoolset (LINK)
    • Software Logistics Toolset 1.0
    • Section "Documentation"
    • System Maintenance

 

Database Migration Option (DMO)

DMO - the one-step-migration to SAP HANA database for SAP systems. It is called "database migration option (DMO) of Software Update Manager (SUM)". For SAP S/4HANA it combines the installation of the SAP S/4HANA, on-premise software and database migration to SAP HANA in one tool

Figure 3.PNG

 

 

See the following SCN Blog with helpful information regarding DMO - SCN LINK

 

 

Adoption Tasks – how SAP support the customer

Simplification List for SAP S/4HANA, on-premise edition 1511

To allow our customers a better planning and estimation of their way to SAP S/4HANA, we have created the “Simplification List for SAP S/4HANA, on-premise edition 1511”. In this list we are describing in detail on a functional level what happens in S/4HANA to individual transactions and solution capabilities. In some cases, we have merged certain functionality with other elements or reflected it within a new solution / architecture compared to the SAP Business Suite products.

For more information see Simplification List for SAP S/4HANA, on-premise edition 1511 (FPS1): PDF

 

Conversion Pre-Checks

Pre-checks are shipped as SAP Notes to customers that want to convert to SAP S/4HANA. Customers can use these pre-checks to find out what mandatory steps they have to carry out before converting to S/4HANA. The results list the instances that need addressing before attempting the conversion process. The checks are run twice again during the conversion process: both times in the Software Update Manager (SUM). The conversion is stopped if errors persist.

 

Implement SAP Note 2182725, and all the related notes attached to it. Make sure to use latest version of this note and regularly check for updates of all attached notes. Implement and run these reports on every system (Sandbox, DEV, QA, PROD) you want to convert to SAP S/4HANA, on-premise edition 1511. Report R_S4_PRE_TRANSITION_CHECKS.

 

Custom Code Checks

These checks are based on the Simplification list concept. Before converting to SAP S/4HANA, on-premise edition 1511 you need to check your custom code against the SAP S/4HANA simplifications. These simplifications are loaded into the Custom Code Check Tool. After you run the tool, you obtain a list of instances where your custom code does not comply with the scope and data structure of SAP S/4HANA 1511, on-premise edition

For more information about the Custom Code Check tool, see SAP Help Portal: Link and the following SCN blog: SAP S/4HANA Custom Code Migration Worklist.

CCBB1.JPG

 

 

 

 

Related information – at a glance

 

 

SAP S/4HANA, on-premise edition – General Information

SAP Help

SAP S/4HANA, on-premise edition 1511 documentation

Link

Getting Started With SAP S/4HANA, on-premise edition 1511

PDF

Conversion Guide for SAP S/4HANA, on-premise edition 1511

PDF

Simplification List for SAP S/4HANA, on-premise edition 1511

PDF

Maintenance Planner – SCN Blog

Link

Link

Software Update Manager (SUM) for SAP S/4HANA, on-premise edition 1511
Software Logistics Toolset 1.0 --> Section "Documentation" --> System Maintenance

Link

Custom Code Check tool (SAP Help)

Link

SAP S/4HANA Feature Scope Description

PDF

SAP SCN

SAP S/4HANA Cookbook

Link

Simplification List for SAP S/4HANA, on-premise edition – XLS-based format

Link

Simplification List TOP Items

Link

Software Update Manager (SUM)  - SCN Blog with more information

Link

DMO Database Migration Option – SCN Blog with more information

Link

SAP SCN - SAP S/4HANA Custom Code Migration Worklist

Link

Custom Code within SAP S/4HANA On-Premise

Link

SAP S/4HANA, on-premise edition:  Additional remarks regarding Business Functions (FPS2)

Link

Miscellaneous

SAP S/4HANA @SAP Learning Hub

Link

S/4HANA Trial

Link

SAP Best Practices for SAP S/4HANA, on-premise edition

Link

SAP Activate

Link

FIORI App Library

Link

 

SAP S/4HANA, on-premise edition – Important SAP Notes

General Information

SAP S/4HANA, on-premise edition 1511: Release Information Note

SAP Note 2189824

SAP S/4HANA, on-premise edition 1511: Restriction Note

SAP Note 2214213

SAP S/4HANA, on-premise edition 1511: supported industry solutions

SAP Note 2214213

SAP S/4HANA, on-premise edition 1511, Country Versions: Release Information & Restriction Note

SAP Note 2228890

Simplification List for SAP S/4HANA, on-premise edition – XLS-based format

SAP Note  2313884

Blacklist Monitor in SAP S/4HANA on premise

SAP Note 2249880

SAP Fiori for S/4HANA

SAP Note 2214245

Process integration with other SAP on-premise systems

SAP Note 2241931

Custom Code related information

Delivery of the S/4H System Conversion Checks

SAP Note 2182725

Custom code check content for SAP S/4HANA on-premise edition 1511

SAP Note 2241080

Running Custom Code Analyzer and Downloading ZIP File(s)

SAP Note 2185390

Business Function related information

SAP S/4HANA, on-premise edition 1511: Always-Off Business Functions

SAP Note 2240359

SAP S/4HANA, on-premise edition 1511: Always-On Business Functions

SAP Note 2240360

Add-On / Partner related information

SAP S/4HANA, on-premise edition 1511: Compatible Add-ons

SAP Note 2214409

SAP S/4HANA, on-premise edition 1511: Compatible partner products

SAP Note  2244450

Add-on Product Versions released on SAP NETWEAVER 7.5

SAP Note 2156130

Uninstalling ABAP add-ons

SAP Note 2011192

Conversions to SAP S/4HANA On-Premise with 3rd Party / non-SAP Add-ons

SAP Note 2308014

SAP NetWeaver 7.5

Additional Information about the update/upgrade to SAP NetWeaver 7.5

SAP Note 2197259

Minimal DB system platform requirements for SAP NetWeaver 7.5

SAP Note  2158828

Coming Wednesday: S/4HANA at SAPPHIRE NOW

$
0
0

If you're here in Orlando with us for SAPPHIRE NOW, here are three Wednesday sessions to add to your agenda.

 

Speed Your Transformation with a Digital Core in the Cloud

Optimize your operations by launching your cloud strategy. Use the SAP S/4HANA Enterprise Management Cloud to establish your digital core. Benefit from an SAP Fiori user experience that is responsive and easy to use.

 

Grow Your SAP HANA Investment with SAP S/4HANA

Expand the benefits of an in-memory platform and optimize your operations. Understand why customers already running the SAP Business Warehouse application or SAP Business Suite powered by SAP HANA software should move to SAP S/4HANA software, and explore new suite innovations. Hear about customers that have taken this step and see what is involved.

 

Discover the Power of Embedded Analytics in SAP S/4HANA

Enable live contextualized insights and proactive decision making. Explore how SAP S/4HANA embedded analytics software brings together analytics and transactions. Compare SAP HANA Live offerings and SAP S/4HANA embedded analytics and see the best use cases for each. Learn what analytic content is delivered and how to build your own analytics.

Maintenance Planner Error

$
0
0

Dear Expert,

 

I ran Maintenance Planner to generate stack for S4HANA conversion. My current system is running on ERP 6.0 EHP5 and I plan to convert the system to S4HANA. I received the following error:

 

maintenance_planner_rfc_error.gif

 

I have checked in SOLMAN_SETUP and the RFC for READ is configured and working fine :

 

READ_RFC.gif

 

I need some idea on how to solve this issue as the Maintenance Planner keep complaining the READ RFC is not exist.

 

Thanks and Best Regards

Tarmizee

SAP S/4HANA Cookbook: Implementing SAP S/4HANA, on-premise edition with SAP Activate

$
0
0

SAP S/4HANA Cookbook

S4_logo.png

 

The SAP S/4HANA Cookbook covers the most important aspects of implementing SAP Business Suite 4 SAP HANA (SAP S/4HANA).

It consists of a small set of HTML landing pages that provide abstracts for specific topics, along with links to further deep-dive information.

 

The content on these pages follows an iterative approach and will be updated regularly.

Comments are disabled on this page to keep it lean.

Please use the SAP S/4HANA forum to raise questions about SAP S/4HANA.

For comments regarding the cookbook itself, please use the accompanying blog.

 

Table of Contents

 

1. What is SAP S/4HANA

  • Read this page to get an overview of SAP S/4HANA, current releases and capabilities, transition paths, ...


2. SAP Simple Finance, On-Premise Edition 1503: Implementation Information

  • This first on-premise version of SAP S/4HANA was released in March 2015. Since this version currently has the highest implementation figures, there is a separate page on it in the cookbook.


3. Implementing SAP S/4HANA with SAP Activate (this page)

   

This page gives an overview of the accelerators consolidated in SAP Activate that  help SAP partners and customers throughout the different phases of SAP S/4HANA implementation projects:

 

  • SAP Activate: Overview
  • End-to-End Customer Experience
  • Discover
  • Prepare
  • Explore
  • Realize


Note: For access to SAP Notes and roadmap information, an 'S-user' is required (see here).


 

 

 

SAP Activate: Overview

Context & SummaryRead on

 


Getting Started with SAP Activate


SAP S/4HANA, the next-generation business suite is addressing the impact of complexity that enterprises are struggling with and is designed to help them run simple.

 

An area where customers dramatically experience this complexity is the initial implementation.

 

Getting started quickly with brand new innovations likeSAP S/4HANAmight sound difficult, but this is where SAP Activatecomes into place.

SAP Activate expedites SAP S/4HANA implementations throughout the customer lifecycle by offering ready-to-run digitized business and technology processes, guided configuration and next-generation methodology.

 

SAP Activate builds on accelerators like SAP Best Practices that help customers get up and running quickly with pre-configured best practice scenarios and functionalities, followed up with continuous updates as new enhancements become available.

SAP Best Practices for SAP S/4HANA are integrated with other SAP cloud solutions, such as SuccessFactors Employee Central or Ariba Network, bringing guidance for all transition options. (for more info, check the SAP S/4HANA: Transition Options section in the Cookbook).

The knowledge and accelerators consolidated in SAP Activate help SAP partners and customers to be well-positioned to adopt new innovations faster than ever before

 

The following assets will guide you through SAP Activate helping you make the best and leverage all the accelerators available to make your SAP S/4HANA implementation project a success: 


SAP Activate on SAP.com

 

 

SAP Best Practices for SAP S/4HANA



SAP Activate Solution Brief



SAP Activate Overview

 

 

SAP Activate project phases:

Picture1.png



Discover


OverviewRead on

 

This ‘’Discover’’ phase will help you consider and experience SAP S/4HANA before starting a project to implement SAP S/4HANA.


  • Experience SAP S/4HANA with the preconfigured SAP Best Practices based Cloud and On-premise trials.

      Cloud and On-premise trials.

  • Explore SAP S/4HANA, on-premise edition with a 30 days trial and evaluate digitized business processes such as order-to-cash or procure-to-pay across your key enterprise functions.


SAP S/4HANA, on-premise edition trial

See first hand how the personalized user experience allows instant insight-to-action from any device to drive on the fly business decisions and immediate execution


  • Access the SAP Activate Use Cases ans Project Recommendations to learn what is the recommended approach to deploy SAP S/4HANA with SAP Activate and what are the covered use cases.



SAP Activate Use Cases and Project Recommendations

 

Prepare


OverviewRead on

 

Find out what are the options to implement SAP S/4HANA, see how you can getting started with SAP Best Practices, how you can activate SAP Best Practices with SAP Solution Builder and how to get started with the SAP Solution Manager 7.2.


  • Listen to the Introducing SAP Best Practices for SAP S/4HANA, on-premise

 

  • access the SAP Best Practices documentation on the SAP Service Marketplace
  • find information about SAP Best Practices for SAP S/4HANA, on-premise edition
  • use scope items
  • find step-by-step documentation about using the software
  • use the documentation for testing your software



Introducing SAP Best Practices for SAP S/4HANA, on-premise

  • Listen to the Activation of SAP Best Practices with SAP Solution Builder recording to learn how to:

 

  • import reference content
  • create a customer solution
  • scope the customer solution
  • activate the customer solution automatically



Activation of SAP Best Practices with SAP Solution Builder

  • Access the Getting Started with SAP Activate and SAP Solution Manager 7.2 and find out how to load SAP Best Practices into customer Solution Manager instance, adjust and manage change projects


Implementing S/4HANA on-premise with SAP Best Practices Using SAP Activate and SAP Solution Manager 7.2


  • Read the Licenses dependencies for SAP S/4HANA Best Practices to get an upfront overview of what software licenses requirements exist for usage of the SAP Best Practices for S/4HANA on-premise edition.



Licenses dependencies for SAP S/4HANA Best Practices



  • Take a look at the Get started with S/4HANA Appliance to see how to accelerate your on-premise project with a ready-to-activate software appliance with software components already installed.


Find out useful information and tips on topics like how to setup the S/4HANA appliance, how to access the SAP CAL (cloud appliance library), how to setup of the initial system or how to setup users. 


Get started with S/4HANA Appliance

 


Explore


OverviewRead on

 

SAP S/4HANA offers a wide range of how fast and individual the solution can be implemented especially in a new implementation project.

On-premise customers set the focus on a better control and flexibility for individualized processes, the scope evaluation starting with FIT/GAP analyses.

This represents the most efficient and fastest scope validation and replaces blueprints of traditional projects.


  • Access How to approach Fit/Gap Analysis (on-premise) to get a detailed approach of conducting a fit/gap analysis from preparing the environment for Fit/Gap to validating the solution, conducting Delta Design Workshops and preparing the Release and Sprint plan.

How to approach Fit/Gap Analysis (on-premise)

 


Realize


OverviewRead on

 

While in the "Explore" phase the scope of the project has been determined and finalized, the "Realize"-phase focuses on the transfer of business requirements to a working configuration of the system. This includes not just the pure configuration of the system, but also the realization of identified integrations scenarios and the migration of data.


 

  • The System Conversion for Logistics and Finance gives an overview of the SAP Best Practices for Migration to SAP S/4HANA that provide existing SAP customers who are looking to benefit from the SAP S/4HANA innovations with proven migration methods and technology reducing risk in critical projects.

System Conversion for Logistics and Finance

 

 

  • Access the Integration Capabilities of SAP S/4HANA to SAP Cloud Solutions for an overview of what you need to know when it comes to SAP S/4HANA integration.

 

Integration Capabilities of SAP S/4HANA to SAP Cloud Solutions

  • Access the Reference Guide How to localize with SAP Best Practices SAP S/4HANA, on premise edition 1511  FPS 01 to find out how to carry out country localizations by leveraging SAP Best Practices.         
    • Find out how to carry out the customizing activities in the transaction SPRO (implementation guide IMG) for special legislations and business practices.
    • This document provides you with the following information about localizations: New features of SAP Best Practices,  Scope coverage of SAP Best Practices, Localization objects per Business Priority
How to localize with SAP Best Practices SAP S/4HANA

 

If you want to find out more about how SAP can help you through your implementation journey of SAP S/4HANA, please see these pages:

 

 

 

 

Comments are disabled on this page. Please use the forum to raise questions, comments, or ideas.


Simplification Item: Subcontracting in MRP

$
0
0

With the TOP Simplification List Items approach we want to start a S/4HANA SCN Blog series to provide more information about dedicated simplification items. Simplification items where we assume that any customer project has to deal with. The following S/4HANA SCN Blog is collecting these TOP Simplification Items with the links to the dedicated S/4HANA blogs.

The TOP Simplification List Items

 

Within this blog we want to provide additional information regarding the Simplification Item: Subcontracting in MRP


Simplification List Item Description

SAP ERP had three different ways of planning parts to be provided to a subcontractor:

•Planning subcontracting demand together with internal demand in the make-to-stock planning segment (3.0 logic)

•Separating subcontracting demand and stock into single subcontracting planning segments and planning uncovered subcontracting demand together with internal demand in the make-to-stock planning segment (4.0 logic)

•Planning the demand of each subcontractor separately using subcontracting MRP areas (available from SAP ERP release 4.5)

In SAP S/4HANA 1511, the 4.0 logic was removed while the 4.5 logic was simplified. The SAP S/4HANA MRP uses default planning parameters if MRP area–specific material master records do not exist. You only have to create an MRP area for every subcontractor. Of course, it is still possible to create MRP area/supplier-specific material master data if required.

 

 

Business Impact

The default way of planning parts to be provided to subcontractors is based on MRP areas. A subcontracting MRP area should be created for every subcontractor. You do not have to create an MRP area-specific material master record for every part to be provided to the subcontractor but of course this is possible if you want to overrule the default planning parameters.

 

Required and Recommended Action(s)

If you have several subcontractors requiring the same component materials and if you do not yet use MRP areas to plan the required components then proceed as follows:

  • Create MRP areas for every subcontractor (can be done before or after upgrade)
  • Run regenerative MRP after the upgrade



For more details see the PDF attached to the following SAP Note:

http://service.sap.com/sap/support/notes/2268044

Simplification Item: Storage Location MRP

$
0
0

With the TOP Simplification List Items approach we want to start a S/4HANA SCN Blog series to provide more information about dedicated simplification items. Simplification items where we assume that any customer project has to deal with. The following S/4HANA SCN Blog is collecting these TOP Simplification Items with the links to the dedicated S/4HANA blogs.

The TOP Simplification List Items

 

Within this blog we want to provide additional information regarding the Simplification Item: Storage Location MRP

 

Description

In SAP ERP, storage locations can be excluded from MRP or they can be planned separately from other storage locations. In the latter case, where storage locations are excluded from MRP, a reorder point procedure with maximum lot size is used to trigger transport reservations to fill up the storage location.

MRP areas cover the very same business requirements. Materials with the MRP area-specific MRP type 'ND' (no MRP) can be used instead of materials with a storage location excluded from MRP. Materials with the MRP area-specific MRP type 'VB' (reorder point planning) can be used instead of materials with separately planned storage locations. The storage location functionality is a subset of the MRP areas capabilities.

The S/4HANA MRP only plans on plant and MRP area level. Planning on storage location level is not available in SAP S/4HANA.

 

 

Business Impact

Storage location MRP is not available in SAP S/4HANA. You have to use planning on MRP area level instead.

 

 

Required and Recommended Action(s)

  • Execute the related conversion pre-checks. Adaption required depending on the pre-check results
  • Run report MRP_AREA_STORAGE_LOC_MIGRATION if the pre-checks detect that storage location MRP is used
  • Remove and avoid inconsistent customizing and generate the required material master records for planning on MRP area level using the storage location material records

 

 

For more details see the PDF attached to the following SAP Note:

http://service.sap.com/sap/support/notes/2268045

Issue on Fiori Launchpad access

$
0
0

Hi All

 

I installed S/4HANA on-premise 30 days trial version (IDES ERP 6.0 Including Enhancement Package 7 on SAP HANA) on Amazon EC2 and activated already. Access by SAPGUI is OK. And now, I want to access by Fiori lunchpad.

 

Does anyone know how could I archive this?

 

I walked through scn topics on this, there are some posts for Fiori launchpad configuration step by step, that's very specific. I just can't figure it out clearly. and not sure was Fiori configured in this trial version already or not?

 

Is there anyone experienced the same thing and got solution already?

 

Thanks

Move Customizations/Developments from ECC 6 (EHP 7) to HANA

$
0
0

Dear All,

We have 2 Independent Systems (2 boxes), 1 ECC 6.0 and other SAP HANA, we need to move the customizations from ECC to HANA System, is there any mechanism to achieve this, can we establish STMS between these 2 systems and move the requests or do we have any other option to achieve the same. We also need to move the existing ABAP Developments to HANA. Kindly suggest.

 

Thanks,

Regards,

Santosh

Coming Thursday: S/4HANA at SAPPHIRE

$
0
0

Alright everyone, tomorrow's the last day of SAPPHIRE. Here are the can't miss sessions before heading to the concert!

 

Explore SAP S/4HANA Now and in the Future

Explore the benefits of staying current when it comes to software innovation. Learn about the innovations delivered in the digital core, SAP S/4HANA, and understand the road map for the suite. Uncover the resources available for you to research and learn more.

 

Make Strategic Deployment Choices for SAP S/4HANA

Explore deployment strategies based on your organization's technology starting point. Understand the available transition paths for SAP S/4HANA software. Learn from the experience of existing SAP S/4HANA suite customers about the decisions that need to be taken in each phase of the journey.

 

Align Business and IT Priorities for Strategic Digital Transformation

Embrace co-innovation throughout your business to enable digital transformation. Hear SAP customers discuss how IT and lines of business are working together to transform business processes and models. Learn how the SAP S/4HANA suite is helping companies run in real time and is making an impact on the bottom line.


While I don't think you'll be able to see the concert via the live stream, there are some great sessions, so head over there now! View Live Agenda

 

Be on the lookout for recorded sessions coming soon!

Simplification Item: Material Field Length Extension

$
0
0

With the TOP Simplification List Items approach we want to start a S/4HANA SCN Blog series to provide more information about dedicated simplification items. Simplification items where we assume that any customer project has to deal with. The following S/4HANA SCN Blog is collecting these TOP Simplification Items with the links to the dedicated S/4HANA blogs.

The TOP Simplification List Items

 

Within this blog we want to provide additional information regarding the Simplification Item: Material Field Length Extension

 

Simplification List Item Description

  • With SAP S/4HANA, on-premise edition 1511, the maximum field length of the material number is extended from 18 to 40 characters.

MFLE1.jpg

  • The appropriate related SAP development entities (domains, structures, table types, and transparent tables, external and internal interfaces, user interfaces, and so on) have been adapted accordingly. Where required, automated logic is in place and executed automatically in case a customer converts his current SAP Business Suite system into SAP S/4HANA 1511.
  • The default setting, both after the move to SAP S/4HANA and for new installations, is that the extended material number functionality is NOT activated. To use a material number with 40 characters, the customer needs to activate this functionality

 

Business Impact

  • In case the customer continues to use to 18 characters long material number functionality, there is no business impact. Depending from the details there might be an impact on existing custom code.
  • In case the customer does activate the extended material number functionality the impact within the multi-system landscape need to be considered where not all related systems are able to deal with a 40 character material number.

 

Required and Recommended Action(s)

  • Execute the related conversion pre-checks and custom code migration worklist to get detailed information about the potentially required custom code adaption effort.

 

 

For more details see the PPT attached to the following SAP Note:

http://service.sap.com/sap/support/notes/2267140

Simplification Item: SD / FIN Credit Management

$
0
0

With the TOP Simplification List Items approach we want to start a S/4HANA SCN Blog series to provide more information about dedicated simplification items. Simplification items where we assume that any customer project has to deal with. The following S/4HANA SCN Blog is collecting these TOP Simplification Items with the links to the dedicated S/4HANA blogs.

The TOP Simplification List Items

 

Within this blog we want to provide additional information regarding the Simplification Item: Credit Management

 

Simplification List Item Description

  • FI-AR-CR Credit Management is not available in SAP S/4HANA, on-premise edition 1511. It has been replaced by SAP Credit Management (FIN-FSCM-CR) for Financials and Sales and Distribution (SD).

 

Business Impact

  • If you are not using FI-AR-CR Credit Management there is no business impact for you.
  • If you are using FIN-FSCM-CR SAP Credit Management already today, there is no business impact for you.
  • If you are using FI-AR-CR Credit Management you need to migrate to FIN-FSCM-CR SAP Credit Management. S/4HANA provides various tools in order to support and automate this migration.
  • FIN-FSCM-CR SAP Credit Management provides additional functionality compared to FI-AR-CR Credit Management. The configuration and activation of the additional functionality is not required in the context of the migration. However, we recommend that you get familiar with these additional capabilities in order to leverage the full value of FIN-FSCM-CR SAP Credit Management and to optimize your credit management processes.

 

Required and Recommended Action(s)

  • In case a migration is required (see above), you need to migrate configuration data, master data, credit exposure data and credit decision data.
  • FIN-FSCM-CR SAP Credit Management is available since ERP 6.0 (without any enhancement packages). Therefore you have the option to activate to FIN-FSCM-CR SAP Credit Management in your existing ERP 6.0 landscape, independent of / before your S/4HANA migration project. This way you can take out complexity out of your S/4HANA migration project. However, there are no tools available on those releases that do an automatic migration of configuration data and master data, as they are on S/4HANA.


For more details see the PPT attached to the following SAP Note:

http://service.sap.com/sap/support/notes/2270544


Simplification Item: Simplified Data Model in Pricing and Condition Technique

$
0
0

With the TOP Simplification List Items approach we want to start a S/4HANA SCN Blog series to provide more information about dedicated simplification items. Simplification items where we assume that any customer project has to deal with. The following S/4HANA SCN Blog is collecting these TOP Simplification Items with the links to the dedicated S/4HANA blogs.

The TOP Simplification List Items

 

Within this blog we want to provide additional information regarding the Simplification Item: Simplified Data Model in Pricing and Condition Technique

 

Simplification List Item Description

  • Several data model changes in the Pricing and Condition Technique area are provided with SAP S/4HANA 1511. These are:
  • Replacement of table KONV with the new table PRCD_ELEMENTS as data persistency for pricing results. KONV is and can still be used for data declaration purposes. It still defines the structure of the pricing result within the application code.
  • The concatenated variable key field VAKEY of a condition table has been removed from all condition header tables, including KONH (pricing), NACH (output determination), KOND3 (campaign determination), KONDN (free goods determination), KONHM (portfolio determination), J_3GPRLHD (CEM price list determination), and WIND (document index). The concatenated variable data field VADAT has also been removed.
  • Several field length extensions

 

Business Impact

  • No impact on the standard SAP business processes
  • The SAP internal program logic has been adapted to the new persistency and the new field lengths.
  • Pricing results of existing documents created before the system conversion (that is, the content of table KONV) are converted as part of the system conversion and transferred automatically to the new data table.
  • It might be required to adapt custom code that is related to the changed data model.
  • Customer code has to be adapted according to the cookbooks in SAP Note 2220005.

 

 

Recommended Action

  • Execute conversion pre-check class CL_S4_CHECKS_PRICING delivered via SAP Note 2188735. If Check ID ‘SAP_KONV_EXTENSION_CHECKS’ indicates that table KONV has been enhanced with customer-specific fields, follow instructions in SAP Note 2189301.
  • Follow instructions in “How-To-Guides” included in SAP Note 2220005 to adapt your objects and code where necessary
  • Run post-processing report PRC_MIG_POST_PROCESSING: See SAP Note 2267308 and “How-To-Guide” in SAP Note 2220005.



For more details see the PPT attached to the following SAP Note:

http://service.sap.com/sap/support/notes/2267308



Can SAP S/4 HANA has all functionality of Business Objects

$
0
0

Dear members

 

I am confused about the functionality of SAP S/4Hana related to BI . Does  S/4 HANA has all feature / functionality which one will get in Business Objects ? . Do we still need to purchase Business Object for BI related functionality  , if we install S/4 HANA ? .

 

Kindly guide us pl .

 

 

With Regards

 

B Mittal

How to create RFC Destination pointing to HCI from S/4HANA?

$
0
0

Hello to everyone,

 

We have an issue trying to connect ERP S/4HANA ON-PREMISE to HCI.  How can I create a proxy connection to HCI or with RFCD?.  I can't find information about S/4HANA ON-PREMISE, a lot of information for ECC but we need S/4HANA.

 

thanks for your attention.

 

regards,

 

Carlos Andres Gonzalez

System requirements for dev machine

Business Partner outbound Idocs in S4HANA 1511 FPS01

$
0
0

Hello,

 

I'm currently implenting S4 Hana 1511 (FPS01) for a customer.

We need to send the Business Partners created/changd in S4 to a legacy system.

 

We were thinking that Idocs is the best approach but I cannot find any Idocs associated to Business Partners that contains all relevant information.

 

What are the options to be able to send Business Partners (and relations) to a leagcy system?

 

I thank you in advance for your help.

 

Best regards,

Rémy

SAP Finance Consultant.

Viewing all 882 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>