Hi guys,
We are in the process of Migrating an ERP 6 EHP7 System to S/4HANA 1511.
During SUM Phase whichs executes Pre-conversion checks I'm stuck with this error
I have applied all Notes mentioned in Note 2182725 - S4TC Delivery of the SAP S/4HANA System Conversion Checks.
SUM phase its showing the following error.
Error
SUM-Phase: PREP_EXTENSION/RUN_S4H_PRE_CHECK_CONS
ERROR: Errors occurred during Execution of S4Hana pre-checks to verify if upgrade is possible. For more information, see the log file of the background job S4_PRE_TRANSITION_CHECKS.AS4. The following is the content of the summary error log file:
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Execution of S4Hana pre-checks to verify if upgrade is possible ERRORS and RETURN CODE in S4_PRE_TRANSITION_CHECKS.AS4
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
4 ETG012 "Start Time Stamp 20160421130412 (2016 04 21;" "13:04:12)"
4 ETG012 "SAP S/4HANA Pre-Transition Check Class Consistency" "Checks."
4 ETG011 "The Check Program is started via SUM."
4 ETG011 "System ID: AS4; SAP_BASIS 740, SP 0008."
4 ETG012 "The software component exception list file exists" "and contains 19 entries."
2EETG012 "Overall Result: The SAP S/4HANA pre-transition" "check data is NOT consistent !!"
4 ETG011 "UIX01TRV"
4 ETG011 "UIX02EA4"
4 ETG011 "UIX02EAP"
4 ETG011 "UIX02RT4"
4 ETG011 " "
2EETG011 "1 Software Component with errors:"
4 ETG012 "The used check class is CLS4H_ECC_DIMP" "(application component IS-A)."
4 ETG012 "Dynamic call of class CLS4H_ECC_DIMP, method" "IS_SW_COMPONENT_USED successfully executed."
4 ETG012 "ECC-DIMP is used and relevant for SAP S/4HANA" "pre-transition checks."
4 ETG012 "Dynamic call of class CLS4H_ECC_DIMP, method" "GET_MINIMUM_TARGET_RELEASE successfully executed."
4 ETG012 "The check requires the minimum target release" "ECC-DIMP 999 SP 99."
2EETG012 "Source sw component ECC-DIMP: Target sw component" "ECC-DIMP: no upgrade target release available !"
4 ETG012 "The used check class is CLS4H_SAP_APPL" "(application component LO-AB)."
4 ETG012 "Dynamic call of class CLS4H_SAP_APPL, method" "IS_SW_COMPONENT_USED successfully executed."
4 ETG012 "SAP_APPL is used and relevant for SAP S/4HANA" "pre-transition checks."
4 ETG012 "Dynamic call of class CLS4H_SAP_APPL, method" "GET_MINIMUM_TARGET_RELEASE successfully executed."
4 ETG012 "The check requires the minimum target release" "S4CORE 101 SP 0000."
2EETG012 "The target release 100 SP 0001 is lower than the" "required minimum target release 101 SP 0000."
Why is asking for Target Release S4CORE 101 SP 0000 When Maintenance Planner calculated for S4CORE 100 SP 0001
Also target release ECC-DIMP 999 SP 99 does not look valid.
I found out these errors are related to Notes 2185960 and 2194272 which contains Check Classes, but couldnt find out why the its showing that message
Hope anyone faced this and could provide some help on how to overcome this.